If the air conditioner is being installed subject to heavy lateral
loads, it is advisable to order a “Roughneck” gasket/bolt
package, part number 48207-3301 to maintain bolt tension,
prevent lateral movement of the air conditioner and guard
against bolt shear.
Once the location for your air conditioner has been determined
(See Section III), a reinforced and framed roof hole opening
must be provided (may use existing vent hole). Before cutting
into the vehicle roof, verify that the cutting action will clear all
structural members and crossbeams. Additionally, the
location of any inner roof plumbing and electrical supplies
must be considered.
Airxcel’s 48000 series requires that the spacing from
the vehicle roof top to the interior ceiling be no less
than 1”. A typical support frame is shown in
Figure 1.
The frame must provide an opening to allow passage
for the power supply wiring. Route the supply wiring
through the frame at the same time the support frame
is being installed.
IMPORTANT – Allow 24” of supply wiring
through the support frame (working length).
After the support frame is installed, seal off all gaps
A. If a roof vent is already present in the desired between the frame and both the roof exterior and the
mounting location for the air conditioner, the interior ceiling of the vehicle (cavity walls).
following steps must be taken. Additionally, seal the gap around the electrical
supply wiring.
1. Remove all screws which secure the roof
vent to the vehicle. Remove the vent and C. This air conditioner is to be installed in accordance
any additional trim materials. Carefully with NFPA Standard 501C.
remove all caulking from around the roof
vent opening to obtain clean exterior roof D. The roof top air conditioner must be mounted as
surface. near level from front to rear and side to side as is
possible when the vehicle is parked on a level plane.
2. It may be necessary to seal some of the old Figure 2 shows maximum allowable degree
roof vent mounting screw holes which may deviations (mounting degrees from total surface
fall outside of the air conditioner basepan flat plane).
gasket.
3. Examine the roof opening. If the opening is
smaller than 14” x 14”, the opening must be
enlarged. If the opening exceeds 15” x 15”,
a mounting frame must be field fabricated
to reduce the opening size (See Figure 1).
B. If a roof vent opening is not used, a new opening
(See Figure 1) will have to be cut into the vehicle
roof. A matching opening will also have to be cut
into the interior vehicle ceiling. Be careful when
cutting the ceiling opening. If the ceiling opening
is carpeted, snagging could occur. After the opening
in the roof and interior ceiling are the correct size, a
framed support structure must be provided between
exterior roof top and interior ceiling. The reinforced
framed structure must provide the following
guidelines:
1. Capable of supporting both the weight of
the roof top air conditioner and the interior
ceiling assembly.
2. Capable of holding or supporting the roof
outer surface and interior ceiling apart, so
that when the roof top air conditioner and
ceiling assembly are bolted together, no
collapsing occurs.
Holes For
Wires
Typical Wood Frame
1"
Minimum
Thickness
FIGURE 1
2 ½"
Minimum
14"